Leelanau County, MI – July 16, 2021 – Written by Jim
When building a structure such as our cabin, there is a unique opportunity to go through and inventory what is within the walls. There is a short period of time between when all of the plumbing, electrical and mechanical systems are installed and when the insulation and drywall go up to take photos of what is between the studs. We’ve never done that with past houses, and were left wondering if there was a wire or pipe where we wanted to put a screw in the wall. For us, that inventory takes place this coming weekend.

There is a lot going on in these walls! We are happy to report that we have our rough plumbing and mechanical inspections complete and the rough electrical and framing inspections happen on Monday.

Here is our crawl space during the plumbing and mechanical work. Once all of the contractors are done with their final connections, we will install the floor liner.
While all that was going on, we were able to get the fireplace framed.

In this photo, I am holding two small maple logs from our property that will act as supports for our mantle. The two small squares in the framing is where those will go. The small square boards in the back of those spaces are pieces from a board that Diana’s dad had a vice mounted to. When I mounted that vice to my bench, I kept the board. I cut the squares so that each contained a hole that Bud drilled to mount the vice. I will put a screw through them to help hold the logs. So in essence, his work lives on in our cabin. We know that he would’ve loved to have helped with this project.

Above the fireplace is where the TV will be. Until we are able to get HGTV on the screen, you will have to settle for my mug. 😊
Our other project over the past week was to get started on the siding. We want to get the one end of the building completed so the mechanical team can install the outside air conditioning unit. Since that side involved a very tall gable, the scaffolding was called into action.

After doing the first section, I realized how many times I would have to set up and tear down the scaffold to complete the project. I had to come up with a plan. When the roof trusses were delivered, they had a 40 foot long I-joist underneath one side to help secure the load. When the trusses were rolled off, the I-joist came off with them, ending up on the bottom of the pile. Since it was essentially scrap, I just tossed it aside on the edge of our driveway to cut up at a later date. Well I am glad I saved it.

I cut it in half and made a set of skis for my scaffold! Good thing I did this, as I had to move the structure many times in both directions.

It slid along nicely using the tractor and a tow strap.

Working at these heights, I secured the scaffolding to the wall with those large deck screws I showed you in our last post.

After a week (including two rain days), I installed the last piece yesterday! With all of the climbing up and down, I will be very happy when the other gable is completed. I’ll do the lower sectional this side this weekend in a different color. That will be revealed in our next post.

On the social side of things, we were treated to the music of Mulebone, a group we spoke of in past years. This blues/roots duo hails from New York City and is a pleasure to listen to. We also had a get together with our friends John and Julie. John was a suite mate of mine in college and they also own a home in Leelanau County. On top of that, we got together with several couples at George and Grace’s new place farther north on the Leelanau peninsula.
Stay tuned for our next post to see how much further we get on our project! Until then, safe and happy travels to all!